Press release – Equipment installment in the Urea Plant

PRESS RELEASE

Tirgu Mures

12th June 2015

 

A piece of large-size equipment was mounted today on the Azomures platform, as part of the plant modernization project.

Azomures, the most important chemical fertilizer manufacturer in Romania, thus continues its series of investments in order to comply with European environmental regulations applicable from 2016 for the production platform.

Measuring 19 m in length and with a 160-ton weight, the equipment (pool condenser) will be part of the new Granular Urea ( mineral fertilizer) production plant . The new equipment will ensure a reduction of raw material consumption and will allow compliance with European environmental regulations applicable from 2016. The equipment was manufactured in the SBN plants in Austria as part of the project coordinated by general contractor Chemoproject in the Czech Republic.

Azomures is presently carrying out the final stages of the major investments implemented for plant modernization and environment protection, investments estimated at over 200 million Euro.

Azomures Press Office